Renovation Plumbing We Do
Nexgen Plumbing NQ does the plumbing for bathroom, kitchen and laundry renovations across Townsville: strip-out, rough-in, moving pipework and fit-off. We work in with your builder, waterproofer and tiler to keep the job on schedule and up to code.
Most renos run to the same order. Getting the layout locked in before rough-in saves the most money, because moving a pipe once the walls are sheeted means pulling them apart again.
Send a photo of the room and a rough plan in the quote form. It helps Justin price the plumbing before he comes out.
Order of Trades in a Renovation
-
Plumber
Strip-Out
The old vanity, toilet, shower and taps come out, and the water and waste are capped off so the rest of the house keeps working.
-
Plumber
Rough-In
New pipework goes into the walls and floor for where everything will sit. This is when the shower, toilet or vanity gets moved, so decide on the layout before this stage.
-
Waterproofer
Waterproofing
The waterproofer seals the floor and walls. We work in with them so the floor waste and pipe penetrations are ready for the membrane.
-
Tiler
Tiling
Tiles go down and up. The floor waste is set flush with the tiles, so the falls take the water where it should go.
-
Plumber
Fit-Off
Vanity, mixers, toilet suite and shower fittings are installed, connected and tested, and the job is left clean.



Fit-off

Moving a Toilet, Shower or Basin
Decide these before rough-in.
- Moving the toilet
- Needs the waste pipe moved. On a slab, that means cutting the floor.
- Moving or enlarging the shower
- The floor waste moves with it, and the falls in the floor have to suit the new spot. Decide before rough-in.
- A new or wider vanity
- Water and waste come out of the wall at set heights. A wall-hung vanity needs them placed exactly.
- Adding a second basin
- Another set of water lines and a waste, usually straightforward if the wall is open.
- Swapping a bath for a shower
- The bath waste is capped or reused, and a floor waste goes in for the shower.
- Kitchen and laundry
- Sinks and dishwasher connections, laundry tubs and washing machine taps, moved and fitted the same way.
Bathroom Renovation Plumbing FAQs
When do I need the plumber in a bathroom renovation?
At the strip-out to cap things off, and at rough-in to run the new pipework before the walls are sheeted and waterproofed. Then at fit-off, once the tiling is done, to install the vanity, taps, toilet and shower fittings.
Can I move the toilet, shower or vanity?
Usually, yes. Moving them means new pipework, so it has to be decided before rough-in. On a concrete slab, moving a toilet or floor waste means cutting into the slab.
Will you work with my builder or tiler?
Yes. We work in with your builder, waterproofer and tiler so the plumbing is ready at each stage and the job stays on schedule. If you’re running the reno yourself, we’ll tell you when each trade needs to be in.
What is rough-in?
The stage where the new water and waste pipes go into the walls and floor, set at the right heights and positions for the fixtures you’ve chosen, before anything is covered up.
Do you do kitchen and laundry renovations too?
Yes. Kitchen sinks, dishwashers, laundry tubs and washing machine taps get the same rough-in and fit-off as a bathroom.
What affects the cost of renovation plumbing?
How much is moving, whether it’s on a slab or highset, the fixtures you’ve chosen, and whether the hot water needs to change. You’ll get a clear, upfront quote before the work starts.